CASE STUDIES
These case studies showcase a few projects and achievements by BIVisualized president, Jake Prevost. Our innovative solutions can be used for various industries. If you are interested in learning more, contact us today!
Parts Master
Within two years of implementation, the manufacturing engineering group experienced a direct labor savings of $2.5 million a year.
CPK
Our analysis tool was able to solve multiple “chronic” quality problems prior to fill rate production.
Quality Report
The pilot area for this report was able to reduce the nonconformance’s per 1000 direct labor hours by 33% in one year.
Job Duration Gauge
The tool was used as a basis of estimation for all jobs where an estimate could not be identified.